The Peak Hours MELs Shedding Scenario adjusts the electric equipment power density of the building during peak hours. The measure used in this scenario is reduce_epd_by_percentage_for_peak_hours
from the Openstudio-GEB-gem developed by LBNL. The gem features a series of measures that provide the capabilities to achieve Grid-interactive Efficient Buildings.
Measure
Description
The measure reduce_epd_by_percentage_for_peak_hours reduces electric equipment loads by a user-specified percentage for a user-specified time period (usually the peak hours). The reduction can be applied to at most three periods throughout out the year specified by the user. This is applied throughout the entire building
Arguments
Arguments that can be specified for this measure are listed below.
Percentage Reduction of Electric Equipment Power (%)
: A value between 0 and 100Start Time for the Reduction
: In HH:MM:SS formatEnd Time for the Reduction
: In HH:mm:SS formatFirst start date for the Reduction
: In mm-dd formatFirst end date for the Reduction
: In mm-dd formatSecond start date for the Reduction
(optional): In mm-dd format; leave blank if not neededSecond end date for the Reduction
(optional): In mm-dd format; leave blank if not neededThird start date for the Reduction
(optional): In mm-dd format; leave blank if not neededThird end date for the Reduction
(optional): In mm-dd format; leave blank if not needed
Users can find the default settings of these arguments in the PeakHoursMelsSheddingMapper.
Using or Modifying the Peak Hours MELs Shedding Scenario
To run and post-process the PeakHoursMelsShedding scenario simply specify the peak_hours_mels_shedding_scenario.csv file when executing at the command line.
uo run -s <path to peak_hours_mels_shedding_scenario.csv> -f <path to example_project.json>
uo run -r -s <path to peak_hours_mels_shedding_scenario.csv> -f <path to example_project.json>
The figure below shows the effect of using this scenario on an example medium office model. The load during peak hours is shed.
Using the reduce_epd_by_percentage_for_peak_hours Measure in Your Own Project
To use the reduce_epd_by_percentage_for_peak_hours measure with your own project, ensure that the Openstudio-GEB-gem is added in your project’s Gemfile:
gem 'openstudio-geb'
and then require it within your custom mapper file:
require 'openstudio/geb'
Then within your .osw workflow file, add the measure and set any common argument values. For example:
{
"measure_dir_name":"reduce_epd_by_percentage_for_peak_hours",
"arguments":{
"__SKIP__": true,
"epd_reduce_percent": 50,
"start_time": "17:00:00",
"end_time": "21:00:00",
"start_date1": "07-01",
"end_date1": "08-31"
}
}